How Long Does a Bathroom Renovation Singapore Project Really Take?

Have you ever thought about the timeline of bathroom renovations in Singapore? If you are a homeowner planning to have one, this question is most likely on your mind. Days? Weeks? Months? It would all boil down to the type of renovation you want to start. And besides, this would require ample preparation–from budget to home comfort–you want to be ready. 

Read on to find out more.

What Affects Your Bathroom Renovation Timeline?

Each house is different, and your timeline depends on a few key things.

Your home type matters. An HDB toilet renovation often follows strict rules. You need approvals and fixed work hours. A condo bathroom may need management clearance. These steps take time, so you need patience at the start.

Your renovation scope also shapes the schedule. A simple bathroom makeover moves faster. A full renovation project with hacking, new tiles, and fittings needs more days. Design choices also matter. Custom toilet design in Singapore often takes longer than a standard look.

The Bathroom Renovation Process From Start to Finish

Planning and Design (1–2 weeks)

You start with planning. You choose a layout, fixtures, tiles, and storage solutions. You think about space utilisation and daily comfort. This is the point at which you decide on the budget and cost range of your renovation. Planning is a time-saving and stress-free activity.

Hacking and Demolition (2–4 days)

The second one is renovating by eliminating the old tiles, fittings, and floors. This step appears chaotic, but it runs quickly. Hacking makes way for new work. In the case of resale houses, this phase usually uncovers concealed problems, hence you remain adaptable.

Waterproofing, Plumbing, and Electrical Work (4–6 days)

Waterproofing is important. You do not want to get water damaged in the future. You, as well, install plumbing lines, electrical, and floor traps. These measures favour quality and high-quality workmanship in the long term.

Tiling and Flooring (4–6 days)

The appearance of your bathroom redecoration is determined by tile work. Floor and wall tiling determine the style, be it sleek, minimalistic, or bold. Fitting tiles properly is time-consuming yet enhances durability and beauty.

Fixture Installation and Finishing (3–5 days)

Now you install fixtures, fittings, and accessories. Sinks, toilets, showers, and storage units are included in this stage. The concluding touches make it smooth and elegant. Your bathroom begins to appear fit to use.

How Long Does a Bathroom Renovation Take Overall?

Modern bathroom design with glass walls

Overall, a renovation could take 3 to 5 weeks. Simple toilet renovation projects may finish faster. Larger bathroom renovation projects with custom work may take longer.

Delays happen sometimes. Delays in the delivery of the material, design alteration, or additional repairs can contribute to days. Proper planning and quick decision-making help keep the schedule on track.

HDB Toilet Renovation vs Condo Bathroom Renovation

HDB toilet renovations often follow stricter rules. You work within approved hours and fixed guidelines. These steps help protect neighbours but may slow the renovation process.

Condo renovations in Singapore often need management approval and lift booking. Access rules may limit work speed. Both options need good coordination with your renovation contractor.

Does Renovation Cost Affect the Timeline?

Yes, renovation cost can affect speed. Renovation packages often move faster because designs and materials stay standard. A toilet renovation package is suitable for homeowners seeking a cost-effective, simple solution.

Custom bathroom renovation cost in Singapore often runs higher and take longer. You wait until you get special fixtures, tiles, or layouts. Both are effective in selecting the one that suits your objectives and budget.

Common Timeline Mistakes You Should Avoid

  • Rushing design choices without fully thinking them through
  • Changing plans in the middle of the renovation
  • Making last-minute material or fixture changes
  • Poor coordination with your renovation contractor
  • Unclear or infrequent communication during the renovation process

Final Thoughts

As you can see, the process is quite easy. Once you learn the steps, you become confident. The majority of projects can be completed in a month if you plan and are flexible.Are you prepared to renovate your bathroom? We at Imperial Collective will take you through each step in order to have a clear timeline and his or her smooth results. We think things through, are transparent, and strive to ensure quality in all aspects. Call us now and make your bathroom the place you’d like to visit daily.